6/19/2023 0 Comments Whitestone bridge toll 2021This segment of the BQE is a critical link of I-278, which is the sole interstate highway in Brooklyn connecting Brooklyn with Queens, the Bronx, and New England to the North/East, and Staten Island and New Jersey to the South/West. John Finley Walk, Promenade over FDR Drive The Project extends between Sands Street on the east and Atlantic Avenue on the west including the entire Atlantic Avenue interchange in the Borough of Brooklyn, New York. NYC DOT plans to rehabilitate John Finley Walk, the promenade above the FDR Drive between E. The project, which is being managed by NYC DOT on behalf of NYC Parks, will implement structural repairs to the underside of the deck, repair walls along the roadway, and replace concrete girders. It will also make important upgrades, eliminating uneven surfaces, improving drainage, replacing the pedestrian railings, and replacing street lighting and benches along the entire span. John Finley Walk, Promenade over FDR Drive – presented to Manhattan Community Board 8 Transportation and Parks Committees in June 2021 (pdf) Riverside Drive Viaduct over West 158th Street The $80 million project will bring needed state of good repair improvements to the 1930s top-level structure. NYC DOT is rehabilitating the Riverside Drive Viaduct between 153rd and 161st streets in Manhattan.
0 Comments
Leave a Reply. |